Projects - Miralcamp

Miralcamp

Construcciones Metálicas Ferrer, has designed, built and installed a floating concrete pontoon Unifloat® 6x3m and a gangway of 20 meters made of hot dip galvanized steel for a water pompout installation in Miralcamp (Lleida). The technicians have to cross the 20 meters gangway to connect the water pomp-out.

This is a small project, where you can see the versatility of C.M.Ferrer, because join their experience in metalwork for more than 50 years with Bellingham Marine know-how in floating structures.

LocationMiralcamp, Catalonia
Year 2015
SystemUnideck®

Another projects

Port Fòrum Unistack
Barcelona (Spain)
Port Fòrum Unifloat
Barcelona (Spain)
Valencia
València (Spain)
Ayia Napa Marina
Ayia Napa (Cyprus)
-->